Zhenhua Vacuum manufacturing hall

Vacuum coating equipment · Since 1992

Vacuum coating systems, built around your process.

Zhenhua Vacuum designs and manufactures coating equipment for automotive parts, optical applications, decorative finishes and production-scale PVD lines.

  1. Substrate
  2. Process
  3. Equipment
  4. Evidence
  5. Handover

Manufacturing evidence

Designed, machined, assembled and tested in-house.

One project moves through engineering, manufacturing, assembly, debugging and acceptance before shipment.

Process definition
Application, substrate and target.
Engineering design
Equipment layout and configuration.
Assembly & debugging
Integration and internal checks.
Acceptance & training
Handover before installation support.
Vacuum coating equipment assembly line CNC machining equipment
Production floor · equipment integration and machining

Zhenhua in 64 seconds

See where vacuum coating fits your production.

Watch our introduction to automotive lighting, decorative PVD and sample evaluation for your first coating project.

English subtitles · 1 minute

Systems engineered for your process.

ZBM1819 automotive lamp-reflector coating equipment

Automotive lighting

ZBM1819

Aluminium deposition and protective-film route for automotive lamp reflectors.

Product details
Continuous optical and magnetron coating line

Production line

Continuous coating line

Continuous optical and magnetron coating equipment for production-scale workflows.

Product details
GFM1916 magnetron optical coating equipment

Gradient colour

GFM1916

Magnetron optical coating direction for gradient bottles and coloured rhinestones.

Product details
ZCL1417 automotive semi-transparent coating equipment

Automotive smart surfaces

ZCL1417

Semi-transparent, non-conductive film direction for luminous logos, ambient-light and interior parts.

Product details

International compliance

CE support for customised equipment.

For customised equipment, CE certification can be arranged when specified in the project. Its scope is tied to the final machine configuration, rather than every model or the company as a whole.

CEMachine-specific scope
  1. 01

    Agreed before engineering

    The CE requirement and applicable scope are confirmed with the project brief.

  2. 02

    One machine, one scope

    Documentation is prepared for the delivered configuration, not as a blanket certificate for the full range.

  3. 03

    Linked to handover

    The conformity file is handled with the acceptance and handover records for that machine.

Vacuum coating equipment assembly workshop
Equipment assembly and integration

About Zhenhua Vacuum

Vacuum coating equipment, developed and built since 1992.

Zhenhua Vacuum develops, designs, manufactures and assembles vacuum coating equipment. Each project begins with the application and process, then moves through engineering, machining, assembly, debugging and acceptance.

Process and engineering
Define the substrate, film target, chamber direction and production flow.
Manufacturing and assembly
Machining, equipment integration and internal checks are supported by established manufacturing operations.
Acceptance and handover
Project evidence is reviewed before packing, installation support and operator training.

Project brief

The useful questions come before the model number.

Share the factors that define the process. The equipment discussion can then start from the right constraints.

Substrate
Material and surface condition
Part geometry
Dimensions, form and coating area
Target coating or performance
Appearance, function or optical target
Throughput
Estimated volume and production rhythm
Existing process
Current coating method or new PVD project

From definition to handover

Evidence before handover.

  1. 01

    Design review

    Align process, equipment and layout.

  2. 02

    Assembly and debugging

    Build, integrate and test in-house.

  3. 03

    Internal QC

    Functional checks and vacuum checks.

  4. 04

    Customer acceptance

    Witness testing and sign-off.

  5. 05

    Packing and shipment

    Prepare the equipment for transport.

  6. 06

    Installation and training

    Support installation and operator training.

Project inquiry

Tell us what you need to coat.

A clear starting brief helps the team focus on the process questions that matter.

Your brief goes straight to our project team, and we reply by email.